Plan for battery energy storage facility on green belt

Date:

Share post:


The public have been giving their opinions on plans for a new energy storage facility on the edge of a Kent village.

Clearstone Energy has suggested building a 300 megawatt (MW) battery storage unit on land in Southfleet, on the metropolitan green belt between Dartford and Gravesend.

The company said the new facility could store enough power for thousands of homes and would generate £50,000 of annual funding to the local community.

Jeremy Kite, leader of Dartford Borough Council, told the BBC that “food security is as important as energy security” and he was concerned the development would impact local agriculture.

Clearstone Energy has been…



Source link

spot_img

Related articles

Precision and Resonance: A Strategic Guide to Healthcare PR Distribution in the GCC

DUBAI, UAE – (ARAB NEWSWIRE) — The healthcare sector in the Gulf Cooperation Council (GCC) is undergoing...

الدقة والتأثير: دليل استراتيجي لتوزيع العلاقات العامة للرعاية الصحية في دول مجلس التعاون الخليجي

دبي، الإمارات العربية المتحدة – (ARAB NEWSWIRE) — يشهد قطاع الرعاية الصحية في مجلس التعاون الخليجي (GCC)...

Navan CTO’s bullish take: ‘Do not use LLMs; use agentic systems’

AI agents are poised to replace standalone LLMs in the enterprise, if Ilan Twig CTO and co-founder...

Paula Scher’s First Foray Into Automotive Design: Why the Premium G Series Is the “Only Answer”

Beijing, China — (ARAB NEWSWIRE) — In the high-end off-road world, truly capable vehicles rarely need lengthy...